End the line at Marigold Station
From Fallen London Wiki (Staging)
A player-created Guide is available for this content: Marigold Station (Guide) |
Spoiler warning! This page contains details about Fallen London Actions. |
From: The Next Stretch of Track
The Great Hellbound Railway has caught up with the Moloch Line, and now you must converge on Hell itself.
Unlocked with exactly 120,
,
3,
Locked with ,
(hidden)
Success
Beyond the far edge
The station itself does not need building […] but there is some fuss about adding a platform suitable for the GHR trains […] The Brass Embassy insists on a meeting […]
But it's all done in the end. You've come too far for the deal to fall apart here or now.[Find the rest of the story at https://www.fallenlondon.com]
You have moved to a new area: Marigold Station
Your maximum Persuasive is now 230. (Sets
to 30)
You've connected the GHR line to Marigold Station. (Sets
Involved in a Railway Venture to 130 - You've connected the GHR line to Marigold Station)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
You've reached the edge of the land you'd surveyed. (Removes all
)
Your 'Approved Station Plans' Quality has gone!
An occurrence! Your 'Marigold: Darkness' Quality is now 3!
Categories:
- Pages Without Guide Restrictions
- Involved in a Railway Venture
- Hinterland Scrip
- Track Laid
- Approved Station Plans
- Tracklayers' Work Stoppage
- Awaiting the Outcome of the Baroness' Proposal
- Actions
- Marigold Station Moves
- Persuasive Gains Gain
- Involved in a Railway Venture Gain
- Track Laid Loss
- Hinterland Scrip Loss
- Terrain Surveyed Loss
- Approved Station Plans Loss
- Marigold: Darkness Gain