Steel and sabotage
From Fallen London Wiki (Staging)
This content was only available during F.F. Gebrandt's Prelapsarian Exhibition!
For the history of this holiday see F.F. Gebrandt's Prelapsarian Exhibition (historical) |
Spoiler warning! This page contains details about Fallen London Actions. |
The Great Hellbound Railway is plagued by persistent delays: engines breaking down, malfunctioning signals, the odd boulder shoved onto the tracks.
Occurs with Abundant Frequency (5 x as common as Standard)
Can not be discarded except by effects clearing your hand.
Options:
Resolve the issues as best you can
- Spoiler
Challenge information
Broad, 200 || 137 - very chancy (41%) || 170 - chancy (51%) || 204 - modest (61%) || 237 - very modest (71%) || 270 - low-risk (81%) || 304 - straightforward (91%) || 334 - straightforward (100%)
Success
Righting the ship
- You've gained 1 x Rumour of the Upper River
- Wounds is increasing… (+1 CP)
Failure
Mounting problems
- In Corporate Debt is increasing… (+1 CP)
- Seeing Banditry in the Upper River is increasing… (+1 CP)