The Next Stretch of Track/Build the station
From Fallen London Wiki (Staging)
Build the station at Ealing Gardens
- Spoiler Unlocked with
Involved in a Railway Venture exactly 40,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans
Locked withTracklayers' Work Stoppage
Success
A simple building
You have moved to a new area: Ealing Gardens
Your maximum Persuasive is now 206. (Sets
Persuasive Gains to 6)
You've opened a station at Ealing Gardens. (Sets
Involved in a Railway Venture to 50 - You've opened a station at Ealing Gardens)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
You've reached the edge of the land you'd surveyed. (Removes all
Terrain Surveyed)
Your 'Approved Station Plans' Quality has gone!
Build the station at Jericho Locks
- Spoiler Unlocked with
Involved in a Railway Venture exactly 50,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans
Locked withTracklayers' Work Stoppage
Success
A mixing of labourers
You have moved to a new area: Jericho Locks
Your maximum Persuasive is now 209. (Sets
Persuasive Gains to 9)
You've opened a station at Jericho Locks. (Sets
Involved in a Railway Venture to 60 - You've opened a station at Jericho Locks)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
You've reached the edge of the land you'd surveyed. (Removes all
Terrain Surveyed)
Your 'Approved Station Plans' Quality has gone!
An occurrence! Your 'Jericho Locks: Darkness' Quality is now 3 - Half-lit!
Build the station at the Magistracy of the Evenlode
- Spoiler Unlocked with
Involved in a Railway Venture exactly 60,
20 x Hinterland Scrip,
Track Laid 4,
Approved Station Plans
Locked withTracklayers' Work Stoppage
Success
A local justice
You have moved to a new area: The Magistracy of the Evenlode
Your maximum Persuasive is now 212. (Sets
Persuasive Gains to 12)
You've opened a station at the Magistracy of the Evenlode. (Sets
Involved in a Railway Venture to 70 - You've opened a station at the Magistracy of the Evenlode)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
Your 'Approved Station Plans' Quality has gone!
An occurrence! Your 'Magistracy of the Evenlode: Darkness' Quality is now 3 - Half-lit!
You've reached the edge of the land you'd surveyed. (Resets
Terrain Surveyed to 0)
With
Terrain Surveyed 4
You have run track to Evenlode through the plains. (Sets
Route Taken to Evenlode to 3 - Through the Plains)
With
Terrain Surveyed 5
You have run track to Evenlode through the hills. (Sets
Route Taken to Evenlode to 6 - Through the Hills)
Build the station at Balmoral
- Spoiler Unlocked with
Involved in a Railway Venture exactly 70,
20 x Hinterland Scrip,
Track Laid 4,
Approved Station Plans
Locked withTracklayers' Work Stoppage
Success
Beyond the far edge
You have moved to a new area: Balmoral
Your maximum Persuasive is now 215. (Sets
Persuasive Gains to 15)
You've opened a station at Balmoral. (Sets
Involved in a Railway Venture to 80 - You've opened a station at Balmoral)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
Your 'Approved Station Plans' Quality has gone!
You've reached the edge of the land you'd surveyed. (Resets
Terrain Surveyed to 0)
An occurrence! Your 'Balmoral: Darkness' Quality is now 3 - Half-Lit!
Build the station at Station VIII
- Spoiler Unlocked with
Involved in a Railway Venture exactly 80,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans,
Terrain Surveyed 5-7
Locked withTracklayers' Work Stoppage
Success
Beyond the far edge
You have moved to a new area: Station VIII
Your maximum Persuasive is now 218. (Sets
Persuasive Gains to 18)
You've opened a station at Station VIII. (Sets
Involved in a Railway Venture to 90 - You've opened a station at Station VIII)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
Your 'Approved Station Plans' Quality has gone!
You've reached the edge of the land you'd surveyed. (Resets
Terrain Surveyed to 0)
An occurrence! Your 'Station VIII: Darkness' Quality is now 3 - Half-lit!
Build the station at Burrow-Infra-Mump
- Spoiler Unlocked with
Involved in a Railway Venture exactly 90,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans
Locked withTracklayers' Work Stoppage
Success
Beyond the far edge
You have moved to a new area: Burrow-Infra-Mump
You have moved to a new setting: Upper River (hidden)
Your maximum Persuasive is now 221. (Sets
Persuasive Gains to 21)
You've opened a station at Burrow-Infra-Mump. (Sets
Involved in a Railway Venture to 100 - You've opened a station at Burrow-Infra-Mump)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
Your 'Approved Station Plans' Quality has gone!
You've reached the edge of the land you'd surveyed. (Removes all
Terrain Surveyed)
An occurrence! Your 'Burrow-Infra-Mump: Darkness' Quality is now 3!
Build the station at Moulin
- Spoiler Unlocked with
Involved in a Railway Venture exactly 100,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans
Locked withTracklayers' Work Stoppage
Success
Closer to Hell
You have moved to a new area: Moulin
An occurrence! Your 'Encounter with a tower' Quality is now 1!
The Tracklayers are waiting for you to deal with the Tower that has imposed itself where a station should be. (Sets
Tracklayers' Work Stoppage to 50 - Intervention by the Hillchanger Tower)
Redirects to: Hillchanger. Again.
^
Try again to build the station at Moulin
- Spoiler Unlocked with
Involved in a Railway Venture exactly 100,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans,
Terms of an Agreement with the Creditor (hidden)
Locked withTracklayers' Work Stoppage
Success
Closer to Hell
You have moved to a new area: Moulin
Your maximum Persuasive is now 224. (Sets
Persuasive Gains to 24)
You've opened a station at Moulin. (Sets
Involved in a Railway Venture to 110 - You've opened a station at Moulin)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
Your 'Approved Station Plans' Quality has gone!
You've reached the edge of the land you'd surveyed. (Removes all
Terrain Surveyed)
An occurrence! Your 'Moulin: Darkness' Quality is now 3 - Half-Lit!
With
Approved Station Plans 1:
An occurrence! Your 'Style of Station at Moulin' Quality is now 1 - Consistent!
With
Approved Station Plans 105:
An occurrence! Your 'Style of Station at Moulin' Quality is now 105 - Fortress-like!
With
Approved Station Plans 110:
An occurrence! Your 'Style of Station at Moulin' Quality is now 110 - In Defiance of Hell!
With
Approved Station Plans 115:
An occurrence! Your 'Style of Station at Moulin' Quality is now 115 - In the Manner of Hell!
With
Approved Station Plans 120:
An occurrence! Your 'Style of Station at Moulin' Quality is now 120 - Bazaarine!
With
Approved Station Plans 130:
An occurrence! Your 'Style of Station at Moulin' Quality is now 130 - Imperial!
With
Approved Station Plans 140:
An occurrence! Your 'Style of Station at Moulin' Quality is now 140 - As the Wasteland Deserves!
With
Approved Station Plans 150:
An occurrence! Your 'Style of Station at Moulin' Quality is now 150 - In Memory of the Surface!
Build the station at The Hurlers
- Spoiler Unlocked with
Involved in a Railway Venture exactly 110,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans
Locked withTracklayers' Work Stoppage
Success
The leader's plan
You have moved to a new area: The Hurlers
Your maximum Persuasive is now 227. (Sets
Persuasive Gains to 27)
You've opened a station at The Hurlers. (Sets
Involved in a Railway Venture to 120 - You've opened a station at The Hurlers)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
You've reached the edge of the land you'd surveyed. (Removes all
Terrain Surveyed)
Your 'Approved Station Plans' Quality has gone!
Darkness is growing around the station. (Sets
Hurlers: Darkness to 3)
Redirects to: Beyond the Far Edge
^
End the line at Marigold Station?
- Spoiler Action Cost: 0
Unlocked withInvolved in a Railway Venture exactly 120,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans,
Awaiting the Outcome of the Baroness' Proposal (hidden)
Locked withTracklayers' Work Stoppage
Success
Decidedly not
Success Instructions: You can pursue this in Ealing Gardens; some work in your Lab may also be relevant.
^
End the line at Marigold Station
- Spoiler Unlocked with
Involved in a Railway Venture exactly 120,
20 x Hinterland Scrip,
Track Laid 3,
Approved Station Plans
Locked withTracklayers' Work Stoppage,
Awaiting the Outcome of the Baroness' Proposal (hidden)
Success
Beyond the far edge
You have moved to a new area: Marigold Station
Your maximum Persuasive is now 230. (Sets
Persuasive Gains to 30)
You've connected the GHR line to Marigold Station. (Sets
Involved in a Railway Venture to 130 - You've connected the GHR line to Marigold Station)
'Track Laid' has been reset: a conclusion, or a new beginning?
You've lost 20 x Hinterland Scrip
You've reached the edge of the land you'd surveyed. (Removes all
Terrain Surveyed)
Your 'Approved Station Plans' Quality has gone!
An occurrence! Your 'Marigold: Darkness' Quality is now 3!